This online course covers the final phase of offshore asset management — disembarkation. Taught by Gemma Douglas, Associate Project Engineer at TAQA and a professional who has personally disembarked five offshore assets, this module covers the key considerations, regulatory requirements, and human factors involved in safely and compliantly leaving an offshore installation for the last time.
Final disembarkation is the last manned phase of any offshore decommissioning project. It bridges the gap between the operational life of the asset and the physical removal campaign. Getting it right — in terms of safety, regulatory compliance, and handover quality — directly affects the efficiency and cost of everything that follows.
Gemma Douglas is an Associate Project Engineer at TAQA, one of the most experienced operators in late-life asset management and decommissioning. She has personally led the disembarkation of five offshore assets across TAQA’s Northern and Central North Sea portfolio, including Tern, Eider, North Cormorant, Cormorant Alpha, and Harding.
This online course is one module within the Lean Decom Decommissioning Training Course — a structured, expert-led system covering the full offshore decommissioning lifecycle. The disembarkation module connects directly to the de-energisation, safety and risk management, and topsides removal modules.
The duty of care to crew continues right to the final helicopter off the platform; disembarkation must be managed with the same rigour as any live operation
Five separate regulatory documents must be updated before the asset can be left as an unattended installation
A thorough punch list and photographic handover package protects both operator and removal contractor from future commercial disputes
The disembarkation timeline directly determines when the removal contractor can mobilise and begin the physical removal campaign
| Topic | Final Disembarkation |
| Industry | Offshore Oil & Gas Decommissioning |
| Instructor | Gemma Douglas, TAQA |
| Part of | Lean Decom Decommissioning Training Course |